Huntsville, Texas, United States
time : May 19, 2024 8:03 AM
duration : 1h 39m 58s
distance : 3.7 mi
total_ascent : 246 ft
highest_point : 428 ft
avg_speed : 2.4 mi/h
user_id : jlanders
user_firstname : Joe
user_lastname : Anders
Checked condition of the FRP bridge in the C57 bike trails. The down-station end is still resting on the sills, though there is additional bank washout and increasing undercutting. The up-station end has experienced additional bank slumping. The upstream side is supported by deck boards resting on a pile. the down stream side is resting on the sills and is poorly (if at all) supported.
Should be able to lift the up-station end and re-support on the piles.
Note there are trees and brush to clear off the trail, and holes to fill in.